New TopShim run:

version = topshim 2.0.0
date = 2024-11-25
time = 16:52:46.537
command = topshim 

FINE SHIMMING

Parameters:

probe = Z114607_0045
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.9 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  4: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  6: FWHM Before= 0.4 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  7: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  8: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  9: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.463

shim changes: 
Z	+80
Z2	-68
Z3	+3
Z4	+183
Z5	-322
Z6	+684
Z7	+2498
Z8	-6363

duration = 3 min 4 sec
completed successfully
finished Mon Nov 25 16:55:48 2024


========================================================================